实木门制造流程
The manufacturing process of solid wood door
(1)门套板加工流程:备料→开料(预留裁剪尺寸每边10mm,双立铣)→贴皮(手工贴科技木,乳白胶)→封边(包覆机,热融胶)→开槽(立铣机)→组装上、下马头与挡条→油漆工序。
(1) the processing flow of the door plate: preparation, opening
(cutting size per side 10mm, double vertical milling) - peels (hand
attached to science and technology wood, milk white glue) - sealing edge
(coating machine, hot melt adhesive) - slotting (vertical milling
machine) - assembly, lower horse head and bar to paint process.
(2)门套线加工流程:备料→开料(预留裁剪尺寸每边10mm,双立铣)→砂光(砂光机,表面磨平)→贴皮(手工贴科技木,乳白胶)→油漆工序。
(2) the processing flow of the door cover line: spare material -
open material (reserved size 10mm, double vertical milling) - sand light
(sand machine, surface grinding) - paste skin (hand attached to science
and technology wood, milk white glue) - paint process.
(3)门加工流程:
(3) door processing flow:
①边枢料:开料(裁板锯)→冷压(冷压机,7.6MPa,压8~12h,乳白胶)→养生(24h,地面要完全平整,使胶水完全固化)→精裁(推台锯)→封边(热融胶)→砂光(砂光机,表面磨平)→平面贴皮(白胶)→开槽(立铣机)→木工检验→待组装→油漆工序。
Edge pivot material: opening (cutting plate saw) - cold press (cold
press, 7.6MPa, pressure 8 ~ 12h, milk Bai Jiao) - Health (24h, the
ground must be completely smooth, the glue is completely solidified) -
finishing (push platform saw) - edge (hot melt adhesive) - sand light
(surface grinding machine, surface grinding) - flat surface skin (Bai
Jiao) - slotting (vertical milling machine) - carpenter inspection,
pending assembly and painting process.
2 core plate: open material (reserved size per side 10mm, cutting
plate saw) - sand light (sand light machine, surface grinding) - flat
skin (Bai Jiao) - carpenter inspection, pending assembly and paint
process.
(4)油漆工序:底德宝→批灰→灰磨→一次底漆→打磨→二次底漆→细磨→修色→面漆。
(4) paint process: dedebao, ash to gray mill, once primer to grinding, two primer to fine grinding, and color to top coat